Brief history of Lenenergo

1886
On 16 July 1886, Emperor Alexander III approved the charter of Electric Lighting Company. On 16 July 1886, Emperor Alexander III approved the charter of Electric Lighting Company. This day is considered the beginning of the electrical age and the foundation date of JSC Lenenergo.
1917
On 16 (29) December 1917, Company of 1886 was nationalized. On 16 (29) December 1917, Company of 1886 was nationalized.
1926
On 19 December 1926, Volkhov hydroelectric plant, the country’s first and the most powerful hydroelectric plant was commissioned. On 19 December 1926, Volkhov hydroelectric plant, the country’s first and the most powerful hydroelectric plant was commissioned.
1932
After several transformations and change of names in 1932 the Company was renamed to Lenenergo. After several transformations and change of names in 1932 the Company was renamed to Lenenergo.
1933
On 19 December 1933, a solemn launch of Nizhne-Svirskaya hydroelectric plant, the world’s first power plant constructed on floating soil, Devonian clays, took place. On 19 December 1933, a solemn launch of Nizhne-Svirskaya hydroelectric plant, the world’s first power plant constructed on floating soil, Devonian clays, took place. Energy of the hydroelectric plant was transmitted to Leningrad on substation Chesmenskaya through power line 220 kV in length of 240 km, for the first time constructed in our country.
1941-1945
The war and the blockade of Leningrad is a separate page in the annals of the St. Petersburg power industry and Lenenergo. The war and the blockade of Leningrad is a separate page in the annals of the St. Petersburg power industry and Lenenergo. More than 1500 engineers died defending the besieged city or supporting the work of the energy system.
1942
In the winter of 1942, the employees of Lenenergo paved four threads of cable 10 kV in besieged Leningrad. In the winter of 1942, the employees of Lenenergo paved four threads of cable 10 kV in besieged Leningrad. This cable in length more than 100 km was later called a «life cable» – due to this unique technical solution power blockade was broken and Leningrad survived.
1949
During the great Patriotic war Lenenergo suffered significant damage: two-thirds of the power grid were lost. During the great Patriotic war Lenenergo suffered significant damage: two-thirds of the power grid were lost. But in 1949, thanks to the selfless work of power engineers capacity and electricity output reached the pre-war level.
1964
28 regional power operational departments of agriculture Selenergo were liquidated 28 regional power operational departments of agriculture Selenergo were liquidated, and eight enterprises of electric networks Lenenergo were established on their base.
1965
Since 1965 formation of main electric grid of 330 kV was launched. Since 1965 formation of main electric grid of 330 kV was launched. Substations Vostochnaya, Chudovo and Yuzhnaya with 330 kV lines were commissioned.
1992
In 1992 Lenenergo, Open Joint Stock Company of the Power Industry and Electrification was established as a result of privatization. In 1992 Lenenergo, Open Joint Stock Company of the Power Industry and Electrification was established as a result of privatization.
2000
From 2000 to 2005 5 new substations of 110 kV were constructed in the Petersburg energy system From 2000 to 2005 5 new substations of 110 kV were constructed in the Petersburg energy system, and more than 120 km of thermal networks and tens of thousands of kilometers of electric networks were reconstructed.
2005
JSC Lenenergo was reorganized by separating into the following companies: JSC Petersburg Generating Company JSC Lenenergo was reorganized by separating into the following companies: JSC Petersburg Generating Company, JSC Northwest Power Management Company, JSC Petersburg Power Trade Company, and JSC Petersburg Transmission Networks.
2008
St. Petersburg acquired a blocking stake in the Company’s authorized capital. St. Petersburg acquired a blocking stake in the Company’s authorized capital.
2010
Within creation of the uniform electric grid company JSC Lenenergo acquired CJSC TSEC (96.95% from the authorized capital) and CJSC Kurortenergo (98.13% from the authorized capital). Within creation of the uniform electric grid company JSC Lenenergo acquired CJSC TSEC (96.95% from the authorized capital) and CJSC Kurortenergo (98.13% from the authorized capital).
2011
Since 01.01.2011 JSC Lenenergo switched to a new system of long- term tariff regulation of RAB (Regulatory Asset Base – adjustable base of the invested capital) Since 01.01.2011 JSC Lenenergo switched to a new system of long- term tariff regulation of RAB (Regulatory Asset Base – adjustable base of the invested capital), which is aimed at attraction of investments into expansion and modernization of infrastructure.
2012
The Agency for strategic initiatives selected JSC Lenenergo to be its partner in the implementation of the roadmap of the project «Increase of energy infrastructure availability». The Agency for strategic initiatives selected JSC Lenenergo to be its partner in the implementation of the roadmap of the project «Increase of energy infrastructure availability». In the framework of this project mechanisms of modernization of the system of technological connection, designed for implementation at the national level have been worked out on the basis of JSC Lenenergo.